Lake Elsinore Stabilization and Enhancement Project

3 Documents in Project

Summary

SCH Number
2001071042
Lead Agency
Lake Elsinore and San Jacinto Watersheds Authority (LESJWA)
Document Title
Lake Elsinore Stabilization and Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2005
Present Land Use
Lake Elsinore recreational facilities, habitat areas, residential development
Document Description
The proposed project includes elements to stabilize lake water elevations, control nutrient inputs to the lake, and to increase dissolved oxygen and therefore water quality conditions in the lake. - Supplemental water addition to Lake Elsinore for lake stabilization and enhancement using recycled water from the Elsinore Valley Municipal Water District's Regional Water Reclamation Facilities. - Nutrient removal facilities to reduce nutrient concentrations in discharges to the lake from the Regional Plant, including: - Installation of facilities at the Regional Plant for chemical removal of phosphorus - Reconfiguration of a portion of existing wetlands in the Lake Elsinore Back Basin into treatment wetlands - Subsurface, diffused air in-lake aeration system - The proposed aeration system includes aeration buildings (compressed air facilities) at the north and south sides of the lake, from which piping would extend onto the lake bottom and bubble air into the water column.

Contact Information

Name
David Ruhl
Agency Name
Lake Elsinore and San Jacinto Watersheds Authority
Contact Types
Lead/Public Agency

Location

Cities
Lake Elsinore
Counties
Riverside
Cross Streets
Chaney St/ Strickland Ave, Lakeshore Dr/Mohr St, Grand Ave/Blanche Dr, Cereal St/Lucerne St
Zip
92220
Total Acres
Various
Parcel #
Various
State Highways
I-15, SR-74
Airports
Skylark Airport
Schools
Elsinore Middle and Butterfield Elementary
Waterways
Lake Elsinore, San Jacinto River, Temescal Creek
Township
6S
Range
4&5W
Section
Var.
Base
SBB&M

Notice of Determination

Approving Agency
Lake Elsinore and San Jacinto Watersheds Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print