Jackson Jr., William
2 Documents in Project
Summary
SCH Number
2001062106
Lead Agency
Humboldt County
Document Title
Jackson Jr., William
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2002
Present Land Use
Agriculture, Timber Production
Agriculture Exclusive with a Special Building Site Combining Zone, Timber Production Zone
GP: Agriculture Suburban, Timber Production
Document Description
A Conditional Use Permit, Surface Mining Permit, Reclamation Plan and review of financial assurance cost estimates for a surface mining operation involving an upland rock quarry with a proposed total extraction of 225,000 cubic yards of aggregate material over an expected life of 15 years. An average of 15,000 cubic yards of material will be extracted per year. The quarry site is approximately 3.6 acres in size. Heavy material to be used on site includes: a bulldozer for excavation; a rock crusher or rock screen for processing; and a rubber-tired loader for sorting, moving and loading the rock aggregate materials. Quarry operations will consist of excavation, ripping, sorting, loading, and hauling. The average number of trucks per day during operations is expected to be 21 with a maximum of 60. No structures or buildings, other than sanitary facilities will be used for the operation. Operations are expected to be conducted an average of 60 days per year.
Contact Information
Name
Michael Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Blue Lake
Counties
Humboldt
Cross Streets
Wildcat Road and Camelot Lane
Zip
95525
Total Acres
3.6
Parcel #
101-051-07
State Highways
299
Schools
Blue Lake Elementary and High School
Waterways
Mad River
Township
6N
Range
2E
Section
21
Base
HM
Notice of Determination
Approving Agency
Humboldt County Planning Department
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes