SANCO Services Modification to a Conditional Use Permit for an Existing Solid Waste Transfer Station, Case No. ER 2003-14 / 2003-24-CUP
7 Documents in Project
Summary
SCH Number
2001061086
Lead Agency
City of Escondido
Document Title
SANCO Services Modification to a Conditional Use Permit for an Existing Solid Waste Transfer Station, Case No. ER 2003-14 / 2003-24-CUP
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2003
Present Land Use
Existing Solid Waste Transfer Station
M-2 (General Industrial)
GI (General Industrial)
Document Description
Modification of a CUP for an existing trash transfer station to reorganize 60,000+/- SF of existing operational area and construct a 36,000+/- SF transfer building addition to increase the total tipping floor area to 35,910 SF for commercial collection trucks and 17,120 SF for self-haul vehicles; increase the Materials Recovery Facility (MRF) area to accommodate the equipment for sorting and bailing of curbside recyclable materials.
Contact Information
Name
Rozanne Cherry
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Escondido
Counties
San Diego
Cross Streets
West Washington Avenue/Rock Springs Road/Metcalf Street
Zip
92033
Total Acres
5.97
Parcel #
228-250-16, -77
State Highways
SR-78/I-15
Railways
NCTD
Schools
Central/Lincoln/Rock Springs
Waterways
Escondido Creek Channel
Notice of Determination
Approving Agency
City of Escondido
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.