Nacimiento Water Project (ED-00-603)

15 Documents in Project

Summary

SCH Number
2001061022
Lead Agency
Army National Guard, California (California Army National Guard)
Document Title
Nacimiento Water Project (ED-00-603)
Document Type
NOD - Notice of Determination
Received
Posted
9/28/2006
Present Land Use
Various

Document Description
The County of San Luis Obispo is proposing geotechnical surveys at two test sites within the riparian zone but outside the active channel of the Salinas River to test for scour depth for the future Nacimiento Water Project alignment. Rotary wash borings will be used to detect groundwater, scour depth, and resistance of subsurface soil to evaluate the appropriate locations of trenchless pipeline installation for the upcoming Nacimiento Water Project.

Contact Information
Deborah Hillyard
California Department of Fish and Game
P.O. Box 47
Yountville, CA 94599

Phone : (805) 772-4318

Location

Cities
Atascadero Paso Robles San Luis Obispo
Counties
San Luis Obispo
State Highways
101
Railways
SPRR
Airports
San Luis Obispo
Waterways
Lake Nacimiento, Salinas River, Nacimiento River
Other Location Info
Cities cont.: Cauycos, Camp Roberts, Paso Robles, Templeton, Santa Margarita

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
San Luis Obispo County County Government Center, Room 310 San Luis Obispo, CA 93408-2040

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print