Tejon Ranch Water Management and Exchange and Wheeler Ridge-Maricopa Water Storage District 850 Canl/Reservoir 1 Pump-back
8 Documents in Project
Summary
SCH Number
2001061013
Lead Agency
Wheeler Ridge -Maricopa Water Storage District
Document Title
Tejon Ranch Water Management and Exchange and Wheeler Ridge-Maricopa Water Storage District 850 Canl/Reservoir 1 Pump-back
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2007
Present Land Use
Irrigated agriculture and grazing are the main land uses in the project area. Most of the project area is zoned as "A" Exclusive Agriculture, and is given a "Resource" designation in the Kern County General Plan.
Document Description
The California Dept. of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant, Tejon Ranchcorp. The project consists of routine maintenance, repairs and sediment removal at 17 weirs, including periodic sediment removal at each diversion, using backhoe, loader, end dump truck, tractor hauling trailer, and 3/4 ton truck, minor maintenance, including repair of weir structures, repair or replacement of related diversion facilities (intake pipelines), cleaning of trash racks or pipeline intake areas, conducted as needed, using hand tools, and occasional vegetation removal, as needed, to avoid structural damage to the weirs, or to remove safety hazards.
Contact Information
Name
Julie Means
Agency Name
California Dept. of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Maricopa
Counties
Kern
Cross Streets
Numerous
Zip
93313
Total Acres
~ 23,200
Parcel #
Numerous
State Highways
I-5
Waterways
Tejon,El Paso,Tunis,Pastoria,Liveoak,Grapevine,Tecuya Creeks;California Aqueduct
Township
Multip
Range
Multip
Section
Multip
Base
Multiple
Other Information
California Aqueduct
Notice of Determination
Approving Agency
Dept. of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.