East Valley High School No. 3 and Continuation High School

4 Documents in Project

Summary

SCH Number
2001061012
Lead Agency
Los Angeles Unified School District
Document Title
East Valley High School No. 3 and Continuation High School
Document Type
NOD - Notice of Determination
Received
Posted
4/15/2002
Present Land Use
Commercial, Industrial, Vacant Zoning: LAM1 - Commercial/Light Industrial General Plan: Manufacturing, Assembly, and Industrial Services
Document Description
The proposed project involves development of two separate school facilities on the same site: East Valley Area New High School No. Three and East Valley Area New Continuation High School. The East Valley Area New High School No. Three would provide 2142 two-semester seats for students in grades 9 through 12 in 89 classrooms; the East Valley Area New Continuation High School would provide 87 two-semester seats for students in grades 9 through 12 in 6 graded classrooms. The two school facilities would operate independently and would not share facilities.

Contact Information

Name
Nicole Nugent
Agency Name
Los Angeles Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Van Nuys Boulevard and Lanark Street
Total Acres
18.2
Parcel #
2210-018-16,.....18; 22101-018-20....25
State Highways
I-405, SR-170
Railways
Metrolink, UPRR
Schools
Monroe High, Van Nuys High, San Fernando High,Burton,Chase St, F
Waterways
Pacoima Wash, Tujunga Wash
Township
2N
Range
15W
Base
SB
Other Location Info
Panorama City
Other Information
Schools: Numeros

Notice of Determination

Approving Agency
Los Angeles Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print