Issuance of a Standardized Solid Waste Facility Permit (SWFP No. 40-AA-0017) for Cold Canyon Landfill Green Material Composting Facility, SAn Luis Obispo County

5 Documents in Project

Summary

SCH Number
2001061010
Lead Agency
San Luis Obispo County
Document Title
Issuance of a Standardized Solid Waste Facility Permit (SWFP No. 40-AA-0017) for Cold Canyon Landfill Green Material Composting Facility, SAn Luis Obispo County
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2002
Present Land Use
Landfill greenwaste compost facility Agriculture zoning
Document Description
Expand the existing Green Material Compost Facility operations onto a 12-acre portion of an 88-acre parcel and subsequently increase the active composting operation capacity to a maximum of 30,000 cubic yards for active composting and 45,000 cubic yards onsite; the estimated average quantities of feedstock materials accepted at the facility are to be 110 tons per day or up to 40,000 tons annually of green material and 3,500 tons per day of grape pomace (5,000 tons by 2006), and 720 tons per year of gypsum/wallboard, totaling a peak annual loading of 120,000 cubic yards per year, associated average vehicle volumes at the facility to be 40 trips per day at the landfill gate, outgoing waste vehicles will number 10 per day.

Contact Information

Name
Jennifer Kiger
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
State Highway 227/ Price Canyon Road
Zip
93401
Total Acres
12
Parcel #
044-171-014
State Highways
227
Railways
Union Pacific Railroad
Waterways
Pismo Creek

Notice of Determination

Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print