City of Escondido Flume Replacement Project
3 Documents in Project
Summary
SCH Number
2001061007
Lead Agency
City of Escondido
Document Title
City of Escondido Flume Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2002
Present Land Use
The project area includes single family residences on large lots, orchards and vacant land. Surrounding properties are located within the unincorporated area and are within the City of Escondido's Sphere of influence. The properties are designated in the City of Escondido General Plan as Estate 1 (up to one du/ac.) and Rural 2 (up to one du/2 ac.).
Document Description
The proposed project consists of constructing approximately 5,600 feet of a 16-inch diameter cement mortar lined and coated steel pipe, 1,300 feet of 12-inch PVC pipeline, and 500 feet of 8-inch PVC pipeline. The project would also involve three pressure-reducing stations to control the water pressure at new connection points to the existing water distribution system.
Contact Information
Name
Michelle Brown
Agency Name
California Department of Health Services
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Escondido
Counties
San Diego
Cross Streets
Oro Verde/Via Cascabel/Via Sinsonite
Zip
92026
Total Acres
7,400 linear ft
State Highways
SR 78
Schools
Orange Glen Elementary and High School; Rockwood Road School
Waterways
Cloverdale Creek, Escondido Creek, Bear Valley Creek
Base
RRDD
Other Information
various parcel numbers
Notice of Determination
Approving Agency
California Department of Health Services
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.