Bothin Creek Bank Stabilization Project
Summary
SCH Number
2001058519
Public Agency
Hueneme School District
Document Title
Bothin Creek Bank Stabilization Project
Document Type
NOE - Notice of Exemption
Received
Posted
5/25/2001
Document Description
This project consists of stabilizing Bothin Creek bank, tributary to Fairfax Creek, tributary to San Anselmo Creek, using rock rip-rap and biotechnical methods. The proposed project includes: rock rip-rap and planted rock rip-rap in a small eroded gully at the upstream end of the Kabus property on the south bank, foundation repair for an existing concrete block wall on the upstream north bank, construction of a planted rock wall along approximately 60 feet of the north bank to control erosion, construction of a one foot high boulder drop structure at the downstream end of the property to control channel degradation, and stabilization of approximately 70 feet of the south bank with biologs and willow cuttings. Bothin Creek supports no known fish populations. Issuance of a Streambed Alteration Agreement Number R3-2001-0018 pursuant to Fish and Game Code Section 1603.
Contact Information
Name
Scott Wilson
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Fairfax
Counties
Marin
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 4; Section 15304
Reasons for Exemption
Minor alteration to land.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.