Essa, Kathleen & Emran Case Number: SP-00-34
2 Documents in Project
Summary
SCH Number
2001052095
Lead Agency
Fish & Game #3
Document Title
Essa, Kathleen & Emran Case Number: SP-00-34
Document Type
NOD - Notice of Determination
Received
Posted
8/13/2001
Present Land Use
Present Land Use: APN 501-281-05 Is currently developed with a single family residence and attached garage. APN 501-281-06 is vacant. APN 501-281-07 is developed with a (SFR).
General Plan Designation: Residential Suburban (RS).
Zoning: Residential One Family (R-1-B-3).
Document Description
Timber removal of potential fire hazard trees surrounding existing single family residences. The applicant proposes to remove 20 trees from two adjacent parcels: twelve (12) trees will be removed from APNs 501-281-05 and -06 which are within 150 feet of an existing residence located on 501-281-05. Furthermore, eight (8) additional trees on APN 501-281-06 will be removed which are within 150 feet of an existing residence located on APN 501-281-07. The applicant owns APNs 501-281-05 and -06. The proposed project will generate approximately 5 truck loads of timber or approximately 25 thousand board feet (MBF). Approximately 0.5 acres is subject to the timber removal. The parcel is served with on-site sewage disposal system and on-site water. The applicant proposes to "yard" the felled trees to a landing on APN 501-281-06, a vacant parcel.
Contact Information
Name
Alyson Hunter
Agency Name
Humboldt County Community Development Services-Planning Division
Contact Types
Lead/Public Agency
Phone
Location
Counties
Humboldt
Cross Streets
Jacoby Creek Road/Brookwood Drive
Zip
95524
Total Acres
0.5
Parcel #
501-281-05; and 06
Waterways
Jacoby Creek
Township
5N
Range
1E
Section
10
Base
H.B.&M
Other Location Info
City Nearest Community: Bayside Area
Notice of Determination
Approving Agency
Humboldt County Planning Department
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes