Bryte Bend Water Treatment Plant Expansion and Pipeline Extension

5 Documents in Project

Summary

SCH Number
2001052088
Lead Agency
City of West Sacramento
Document Title
Bryte Bend Water Treatment Plant Expansion and Pipeline Extension
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2006
Present Land Use
Public/Quasi Public Industrial, Commercial, Agriculture
Document Description
The City of West Sacramento proposes to increase capacity at its Blythe Bend Water Treatment Plant from 24 million gallons per day to 60 mgd within the City's boundaries. As part of the proposed project, the City is planning to replace three of its existing fish screens and two new fish screens at its intake structure on the Sacramento River to meet current criteria for listed fish species (Delta smelt and steelhead). The proposed project also includes extending an existing 36-inch water transmission main approximately 2.3 miles to the Southport area to improve City water supply delivery service.

Contact Information

Name
Steve Rikala
Agency Name
California Department of Health Services
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Cross Streets
South River Road/Harbor Boulevard/Industrial Boulevard
Parcel #
14-640-32
State Highways
I-80
Railways
Union Pacific
Waterways
Sacramento River, Port of Sacramento Shipping Channel
Township
9N
Range
4E
Section
32

Notice of Determination

Approving Agency
California Department of Health Services
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print