Dawson Major Subdivision, TM 5157, ER #99-14-005

4 Documents in Project

Summary

SCH Number
2001051147
Lead Agency
San Diego County
Document Title
Dawson Major Subdivision, TM 5157, ER #99-14-005
Document Type
NOD - Notice of Determination
Received
Posted
3/19/2007
Present Land Use
The project is subject to the Regional Land Use Element Policy 2.1 Urban Residential and General Plan Land Use Designation (3) Residential. The current zone is RR-2 Use Regulation which requires a net minimum lot size of 0.5 acres.
Document Description
The project proposes to subdivide a 14.95-acre parcel into twenty half-acre minimum parcels. A private road system will be constructed off of Hidden Mesa Road; two cul-de-sacs (to be named Hidden Springs Drive and Hidden Springs Court) will provide access to all twenty parcels but there will only be one point of access from Hidden Mesa Road. The access will be a gated entry. Utilities and public services will be provided by the Otay Water District, San Miguel Fire Department, Cajon Valley School District, and the Grossmont Union High School District. An open space easement will be dedicated on portions of parcels 1-11 and 15-20 to ensure compliance with the Valle de Oro Community plan. No sensitive environmental resources exist on the property.

Contact Information

Name
Kalla Hirschbein
Agency Name
County of San Diego Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Hidden Mesa Road and Hidden Springs Road
Total Acres
14
Parcel #
517-111-30
State Highways
S17/54
Waterways
Sweetwater River
Township
16S
Section
19
Base
SBM
Other Location Info
City/Community: Valle de Oro

Notice of Determination

Approving Agency
County of San Diego Planning and Environmental Review Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print