Seawater Desalination Project at Huntington Beach: Outfall/Intake Modifications and Lease Amendment

12 Documents in Project

Summary

SCH Number
2001051092
Lead Agency
City of Huntington Beach
Document Title
Seawater Desalination Project at Huntington Beach: Outfall/Intake Modifications and Lease Amendment
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2017
Document Description
Note: Per CA State Lands Commission acting as CEQA Responsible Agency. Proposal to amend CSLC Lease No. PRC 1980.1 to modify the existing Huntington Beach Generating Station Once Through Cooling (OTC) seawater intake and discharge (outfall) pipelines within the Lease area (the project). The lease Modification project, as approved, includes two technology enhancements associated with Poseidon's proposed seawater desalination facility at Huntingtin Beach: 1) Install four rotating brush-cleaned (self-cleaning) stainless steel 1-mm wedgewire screens on the offshore end of the seawater intake line (environmentally superior alternative), and 2) install a multiport diffuser on the offshore end of the outfall.

Contact Information

Name
Cheryl Hudson
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach
Counties
Orange
Cross Streets
Offshore of Huntington Beach State Park (adjacent to 21730 Newland Street)
Zip
92648
Total Acres
11.78
Parcel #
N/A
State Highways
1
Schools
Edison HS, John Eader
Waterways
Pacific Ocean, Santa Ana River

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print