Santiago Creek Trail; Santiago Creek Bicycle Trail

4 Documents in Project

Summary

SCH Number
2001051022
Lead Agency
Orange, City of (City of Orange)
Document Title
Santiago Creek Trail; Santiago Creek Bicycle Trail
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2002
Present Land Use
RO (Receation-Open space), R-1 (Single-family residential), R-2 (Duplex residential), PC (Planned community ), R-3 (Multi-family residential)

Document Description
Alter the streambed to construct the Santiago Creek Bike Trail adjacent to Santiago Creek. Improvement of three additional sections of trail linking the path along the creek. The path will consist of a ten foot-wide paved trail with two foot-wide graded shoulders. Undercrossings will be constructed at State Route 22 (SR-22), Cambridge Street, and Tustin Street. The undercrossings at SR-22 and Tustin Street will be constructed on an existing dirt path, while the undercrossing at Cambridge Street will involve the grading of the bank and the placement of rip rap within the streambed.

Contact Information
Joan Wolff
City of Orange
300 E. Chapman Avenue P.O. Box 449
Orange, CA 92866

Phone : (714) 744-7220

Location

Cities
Orange
Counties
Orange
Cross Streets
State Route 22 and Glassell Street
Zip
92866
Total Acres
1
Parcel #
multiple
State Highways
SR 22, 57, 5, 55
Railways
Union Pacific
Waterways
Santiago creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search