DeLuz Murrieta Pipeline Extension

2 Documents in Project

Summary

SCH Number
2001051007
Lead Agency
Fallbrook Public Utility District
Document Title
DeLuz Murrieta Pipeline Extension
Document Type
NOD - Notice of Determination
Received
Posted
2/8/2002
Present Land Use
A-70 Rural Agriculture
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1601 of the Fish and Game Code to the project applicant, Mr. Joe Jackson, representing Fallbrook Public Utility District. The applicant proposes to alter the streambed within an unnamed stream, tributary to DeLuz Creek and the San Luis Rey River to accommodate the 7,000 foot extension of the DeLuz-Murrieta waterline, impacting 0.01 acre of streambed. The majority of the line will be within the paved area of DeLuz Murrieta Road, however there are two stream crossings. Both of these crossings will require temporary stream diversion while the pipeline is encased in concrete off of the existing concrete ford structures.

Contact Information

Name
Tamara A. Spear
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Deluz Road
Zip
92028
Total Acres
0.5
Parcel #
County Road
Schools
DeLuz School
Waterways
DeLuz Creek
Township
8S
Range
4W
Section
22,28,
Base
SBB&M
Other Location Info
Deluz
Other Information
section: 27

Notice of Determination

Approving Agency
California Department of Fish and Game
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print