Concurrence in the revision of Solid Waste Facility Permit No. 55-AA-0010 for the Cal-Sierra Materials Recovery Facility
3 Documents in Project
Summary
SCH Number
2001042025
Lead Agency
Tuolumne County
Document Title
Concurrence in the revision of Solid Waste Facility Permit No. 55-AA-0010 for the Cal-Sierra Materials Recovery Facility
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2001
Present Land Use
Light Industrial (LI)
M-1 (Light Industrial) and O (Open Space)
Cal Sierra Transfer, Inc., Material Recovery Facility (MRF)/Transfer Station
Document Description
Revise the Solid Waste Facility Permit to allow an increase in the total acreage of the facility and an increase in the Permitted Maximum Tonnage from 200 tons per day to 350 tpd and Permitted Traffic Volume from 262 vehicles per day to 380 vpd at the Cal Sierra Materials Recovery Facility Transfer Station.
Contact Information
Name
Virginia Rosales
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sonora
Counties
Tuolumne
Cross Streets
State Route 108 / Industrial Drive
Total Acres
6.2+/-
Parcel #
61-040-33 and 61-080-02
State Highways
108
Railways
Sierra Railroad
Schools
Curtis Creek Elementary
Waterways
Curtis Creek and Sullivan Creek
Township
1N
Range
15E
Section
3
Base
MtDiablo
Notice of Determination
Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.