Metrobase Facility - Harvey West

10 Documents in Project

Summary

SCH Number
2001042003
Lead Agency
Santa Cruz Metropolitan Transit District
Document Title
Metrobase Facility - Harvey West
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2003
Present Land Use
Zoned Public Facility and Industrial; project sites currently occupied by existing SCMTD and industrial facilities.
Document Description
The proposed MetroBase facility consists of an operations and maintenance facility to support 98 buses on two sites. Project implementation will require the acquisition of two existing businesses. Proposed improvements on the River Street site include a new Liquified Compressed Natural Gas (LCNG) fueling station, a bus washing structure, renovation of the existing operations building to include a second floor, and reconfiguration of the parking and circulation areas. Improvements on the Golf Club Drive site consists of construction of a new 10-bay maintenance facility, renovation of the existing maintenance building, and reconfiguration of the parking and circulation.

Contact Information

Name
Les White
Agency Name
Santa Cruz Metropolitan Transit District
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Encinal Street/River Street/Golf Club Drive
State Highways
9/1
Railways
Santa Cruz Big Trees and Pacific
Waterways
Pogonip Creek/San Lorenzo River
Other Information
Railway Company Rail line; The project is located on two sites within the Harvey West neighborhood, one on River Street opposite Golf Club Drive and the other on Golf Club Drive west of River Street.

Notice of Determination

Approving Agency
Santa Cruz Metropolitan Transit District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print