Heart of the City Specific Plan Master EIR (IES 00-11)

7 Documents in Project

Summary

SCH Number
2001041082
Lead Agency
City of Redondo Beach
Document Title
Heart of the City Specific Plan Master EIR (IES 00-11)
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2002
Present Land Use
Mixed Use (includes public facilities, residential, commercial and industrial uses)
Document Description
The Project includes adoption of the Heart of the City Specific Plan; creation of a new "Heart of the City" Redevelopment Project Area; amendment of the City's General Plan and Zoning Ordinance for consistency with the Heart of the City Specific Plan (including amendment to the Zoning Map designations for property in the Project area); amendment of the Coastal Land Use Plan and adoption of the Implementing Ordinance for the Coastal Land Use Plan; private development of certain parcels within the project area; public facilities upgrades (including a new fire station, water and storm drain system improvements, street and pavement improvements, public art, and street furniture); relocation of the boat hoist; demolition or relocation of existing structures and utilities; creation of a transit center; and other related actions.

Contact Information

Name
Randy Berler
Agency Name
City of Redondo Beach and Redevelopment Agency
Contact Types
Lead/Public Agency

Location

Cities
Redondo Beach
Counties
Los Angeles
Cross Streets
Harbor Drive and Beryl Street
Total Acres
355
State Highways
SR-1 (Pacific Coast Highway)
Waterways
Pacific Ocean (adjacent to the west)
Township
4S
Range
14W
Section
LA
Base
Redondo
Other Location Info
Redondo Beach (118'29'W,33'46'N)
Other Information
Base: Redondo Beach

Notice of Determination

Approving Agency
City of Redondo Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print