Owens Valley CDF Conservation Camp Utilities Replacement Project

3 Documents in Project

Summary

SCH Number
2001041027
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Owens Valley CDF Conservation Camp Utilities Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/7/2001
Document Description
The California Department of Forestry and Fire Protection (CDF) proposes to: Install a new water well that is adequately separated from a nearby septic system and to provide adequate water capacity to meet the Uniform Fire Code for buildings on the site. Update the water distribution system to the various buildings on the site in accordance with the Uniform Plumbing code. Remove overhead utility lines and replace with underground electrical service to improve the reliability of service on the site, remove overhead hazards and improve appearances. Install a septic to a more advantageous location and to meet Uniform Plumbing Code requirements. Connect waste lines from the existing trailer residences to the new septic tank. Perform additional site work, including patching of asphalt paving, concrete work, and four new site lighting poles and fixtures. Install a new floor hoist system at an existing maintenance building.

Contact Information

Name
Luke Wilson
Agency Name
Department of Forestry And Fire Protection
Contact Types
Lead/Public Agency

Location

Cities
Bishop
Counties
Inyo
Cross Streets
Highway 395 and South Round Valley Road
State Highways
395

Notice of Determination

Approving Agency
California Department of Forestry and Fire Protection
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print