PUD-99-01 Lemoine Property Development

Summary

SCH Number
2001039035
Lead Agency
City of Pleasanton
Document Title
PUD-99-01 Lemoine Property Development
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2001
Document Description
The applicant proposes to culvert portions of three drainages at 4456 Foothill Road, Pleasanton, in order to accommodate road widening and development. Widening of Foothill Road will require replacing approximately 115 feet of stream with 100 feet of 24-inch diameter culvert and headwall. On the northwest corner of the project site two culverts will be constructed, one new and the other replaced. The new culvert will be approximately 45-feet long with a 50-square-foot riprap outfall energy dissipater (10 x 5). The replacement culvert will be approximately 65-feet long with a 50-square-foot riprap outfall energy dissipater (10 x 5). This project also includes planting native riparian trees and shrubs along the top of bank. The trees and shrubs will be maintained and monitored for 5 years, and the applicant will provide a monitoring report to the Department yearly. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number R3-2000-1376 pursuant to Section 1603 of the Fish and Game Code to the project operator, Phil Rowe/Delco Builders and Developers.

Contact Information

Name
Derek Acomb
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency

Location

Cities
Pleasanton
Counties
Alameda
Other Location Info
4456 Foothill Road

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A