El Dorado Lift Station South Pond Reconstruction Project

2 Documents in Project

Summary

SCH Number
2001032108
Lead Agency
El Dorado Irrigation District
Document Title
El Dorado Lift Station South Pond Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2001
Present Land Use
Public Facility
Document Description
The project involves the reconstruction/lining of the South Pond through regrading and/or installation of a liner to provide peak wet weather equalization storage during storm events. The District will construct the appropriate lining to meet the existing California Regional Water Quality Control Board, Central Valley Region waste discharge requirements for the El Dorado Lift Station Equalization Pond, including preventing wastewater contaminants from percolating into groundwater. The pond will be constructed, operated and maintained to prevent inundation or washout associated with a 100-year storm event. The District's construction contract documents will include protecting soil stockpiles, or other materials that can be blown away by wind, covering, or watering. It will also include washing affected paved areas at least once daily, in accordance with El Dorado County APCD Rule 223.

Contact Information

Name
W. Chris Word
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Pleasant Valley Road
Zip
95623
Total Acres
>1
Parcel #
331-251-02
State Highways
49
Waterways
Slate Creek
Township
10N
Range
10E
Section
34, 35
Base
MDBM
Other Location Info
City/Nearest Community: El Dorado

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.