Main Street at Cottonwood Creek Bridge Replacement

3 Documents in Project

Summary

SCH Number
2001032104
Lead Agency
Shasta County
Document Title
Main Street at Cottonwood Creek Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2001
Present Land Use
Mineral Resource and Flood Plain

Document Description
Replace the existing 1,200 foot, 20-span, Main Street Bridge over Cottonwood Creek with a 1,200 foot, 9-span, prestressed concrete girder bridge on the same horizontal alignment. Shoulders will be widened to meet AASHTO standards; however, the number of through lanes will not increase. Construction is anticipated over a two-year period and will be phased such that the bridge can remain open during the first year while the substructure is completed. A detour will consist of a 200 foot temporary bridge over Cottonwood Creek and will include two through, paved lanes. The detour will be removed upon completion of the new bridge.

Contact Information
Dan Little
Shasta County Public Works
Lead/Public Agency
1855 Placer Street
Redding, CA 96001

Phone : (530) 245-6819

Location

Counties
Shasta
Cross Streets
Main Street & First Street
State Highways
Interstate 5
Railways
SPRR
Waterways
Cottonwood Creek
Township
29N
Range
4W
Section
11&14
Other Location Info
City/ Nearest Community: Cottonwood

Notice of Determination

Approving Agency
Shasta County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Shasta County Department of Public Works 1855 Placer Street Redding, CA 96001

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print