East Connector Roadway Project

7 Documents in Project

Summary

SCH Number
2001032073
Lead Agency
United States Department of Transportation, Federal Highway Administration (FHWA)
Document Title
East Connector Roadway Project
Document Type
NOD - Notice of Determination
Received
Posted
3/10/2003
Present Land Use
Mixed community land uses. Zoning in the area is primarily Industrial, Commercial, and Residential.
Document Description
* A two lane undivided, limited access arterial with 12 foot lanes and 6 to 8 ft shoulders, including a Class II bicycle lane on each shoulder. New traffic signal at the intersection with SR 299/Glen Road, and a stop controlled intersection with SR 3. * A new vehicle bridge over East Weaver Creek. * Realignment of Glen Road to tie into the intersection of the East Connector with SR 299. * Alteration of the access to Nugget Lane from Glen Road; and alteration of the police vehicle access to the CHP building. * Re-striping of the exitsing two way left turn lane on SR 299 to incorporate exclusive left turn lanes from eastbound SR 299 to the East Connector and from westbound SR 299 to Glen Road. * New access to the Trinity Plaza Shopping Center and to the Trinity River Lumber Mill from the East Connector. * Two new culvert crossings of Lance Gulch. * Extension of Pioneer Lane to tie into the East Connector. * Left turn lanes (pockets) on the East Connector at all county road and state highway intersections. * A separate Class I bicycle/pedestrian trail adjacent to Levee Road on the east side, with a bridge crossing East Weaver Creek near Lowden Park. * Possible future Class I bicycle/pedestrian trail along the east side of the East Connector from Pioneer Lane to Brown's Ranch Road, to be built by the Weaverville Basin Trails Committee.

Contact Information

Name
John Jelicich
Agency Name
Trinity County Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Trinity
Cross Streets
Highway 299, 3
Zip
96093
State Highways
SR 3 & 299
Airports
Weaverville Airport
Schools
Weaverville Elem. and Trinity
Waterways
East Weaver Creek
Township
33N
Range
9W
Section
7
Base
MDBM
Other Location Info
Weaverville

Notice of Determination

Approving Agency
Trinity County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print