Starr Creek Tributary 7 Storm Drain Project

3 Documents in Project

Summary

SCH Number
2001032033
Lead Agency
Town of Windsor
Document Title
Starr Creek Tributary 7 Storm Drain Project
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2001
Document Description
The proposed project consists of the construction of approximately 1300 linear feet of 54 inch +/- underground storm drain to convey a portion of stormwater flows in Starr Creek Tributary No. 7 from Wild Oak Drive to Windsor River Road, including manholes, an inlet structure upstream of Wild Oak Drive, the undergrounding of approximately 40 linear feet of open channel across the front yard of an existing residential parcel, and an outlet structure downstream of Windsor River Road; replacement of an existing 36 inch roadway culvert at the crossing of Starr Creek Tributary No. 7 under the entrance drive to Keiser Community Park with a 54 inch +/- culvert; curb, gutter, sidewalk, and roadway improvements to alleviate inadequate drainage along Oak Park Street from Wild Oak Drive to Windsor River Road; approximately 400 linear feet of ancillary 18 inch +/- storm drains, including inlets; and the relocation of existing utility facilties and acquisition of property rights and permits necessary to accomplish the project.

Contact Information

Name
Wilhelm Daida
Agency Name
City of Windsor
Contact Types
Lead/Public Agency

Location

Cities
Windsor
Counties
Sonoma
Zip
95492
Parcel #
066-060-030/066-070-006/066-070-011/066-070-033/066-070-073/066-170-015/066-170-017,
Other Information
Parcel: 066-180-040

Notice of Determination

Approving Agency
Windsor Town Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print