The Promontory Offsite Water Line and Offsite Sewer Line

2 Documents in Project

Summary

SCH Number
2001032024
Lead Agency
El Dorado Irrigation District
Document Title
The Promontory Offsite Water Line and Offsite Sewer Line
Document Type
NOD - Notice of Determination
Received
Posted
4/17/2001
Present Land Use
Residential
Document Description
This project provides water and sewer lines to serve The Promontory and supplements the existing water system for the area. A portion of a water line will also be altered to accommodate demands for increased storage capacity of the Oakridge tank. The water and sewer alignments are part of a large water and sewer line system and include an approximately 3,000 if 16-inch water line beginning at the intersection of Brittany Way and El Dorado Hills Boulevard, heading south along El Dorado Hills Boulevard, then west in a SMUD/PG&E easement until reaching The Promontory Site; approximately 1,500 if of 8-inch water line within the same SMUD/PG&E easement; and an approximately 900 if 15-inch gravity sewer line leaving, re-entering and leaving again the southeastern portion of the site at its boundary with the Ridgeview West subdivision.

Contact Information

Name
W. Chris Word
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
El Dorado Hills Boulevard
State Highways
50
Waterways
Folsom Lake
Township
10N
Range
8E
Section
27/28/
Base
MDB&M
Other Location Info
El Dorado Hills
Other Information
Section: 33/34

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print