San Ysidro Debris Basin Modification

20 Documents in Project

Summary

SCH Number
2001031043
Lead Agency
Santa Barbara County Flood Control District
Document Title
San Ysidro Debris Basin Modification
Document Type
NOD - Notice of Determination
Received
Posted
12/7/2023
Document Description
The Project is limited to the modification of the San Ysidro debris basin to allow for fish passage, improve the flood control functionality, and restore sediment transport through the watershed. To modify the dam, a central portion will be excavated and replaced with an open outlet structure. The Project will reconstruct a pilot channel for the San Ysidro Creek within the debris basin using the stream simulation method. Post-project monitoring will occur to evaluate the effectiveness of the modification for at least five years. The Project will result in 0.45 acre of impacts through the grading, dam removal, channel construction, and stream reconfiguration. No trees will be removed as part of the Project.

Contact Information

Name
Nicole Leatherman
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
North of the Community of Montecito
Counties
Santa Barbara
Regions
Southern California
Other Location Info
The San Ysidro Debris Modification Project is located along San Ysidro Creek within the San Ysidro debris basin directly west of 900 W. Park Lane north of the community of Montecito, County of Santa Barbara, State of California; Latitude 34.449566, Longitude -119.622865.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Barbara
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print