Armstrong Ranch

3 Documents in Project

Summary

SCH Number
2001031004
Lead Agency
City of Santa Ana
Document Title
Armstrong Ranch
Document Type
NOD - Notice of Determination
Received
Posted
10/28/2002
Present Land Use
The project site consists of ~46.9 acres of agricultural land bordered by MacArthur Boulevard on the south, Bear Street on the east, Alton Avenue on the north, and institutional uses and Greenville Street on the west. The Land Use Element of the General Plan designates the site as Low Density Residential (LR-7), and the existing zoning is Specific Development-4 (SD-4). In 1977, the City adopted Ordinance No. NS-1362 providing specific development regulations for the project area. The site is not located within any adopted specific plan, redevelopment project area, or enterprise zone; however, the property has been identified as a District within the Urban Design Element of the General Plan.
Document Description
Proposed project is an amendment to the SD-4 Zoning District to reduce required side yard setbacks from 5-feet to 4-feet, increase maximum allowable lot coverage to exceed 50-percent coverage, to allow churches as a permitted use, to increase maximum density to 6.5 dwelling units per acre and to allow an increase in the maximum height from 35-feet to 150-feet.

Contact Information

Name
Daniel Bott
Agency Name
City of Santa Ana
Contact Types
Lead/Public Agency

Location

Cities
Santa Ana
Counties
Orange
Cross Streets
MacArthur Boulevard/Bear Street
Total Acres
49
Parcel #
140-061-90, 20, 59, 75
State Highways
SR-55/SR-73
Railways
UPRR
Airports
Orange County
Waterways
Santa Ana River
Township
5S
Range
10W
Section
33
Base
NBQ

Notice of Determination

Approving Agency
City of Santa Ana
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print