Gilroy Sports Park and Urban Service Area Project

Summary

SCH Number
2001029019
Lead Agency
City of Gilroy
Document Title
Gilroy Sports Park and Urban Service Area Project
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2001
Document Description
The construction of three outfall drain structures, all along the east bank of Uvas Creek. Where Uvas Creek flows under the Luchessa Avenue bridge, the proposed improvements include a 12-foot wide asphalt bike path and concrete retaining wall with heights up to nine feet for approximately 300 feet along the creek bank and an 8-inch storm drain outfall. Approximately 300 feet downstream of the Luchessa Avenue bridge, a 12-inch storm drain outfall is proposed. Where Uvas Creek flows adjacent to the west end of Farman Lane, a 36-inch storm drain outfall is proposed. It is anticipated that backhoes and bulldozers will be used for this construction. These outfalls will prevent flooding and erosion into Uvas Creek from the new bike/pedestrian trail being constructed along the creek bank. The California Department of Fish and Game is executing a Lake and Streambed Alteration Permit Number #R3-2000-1323 pursuant to Section 1601 of the Fish and Game Code to the project operator, Bill Headley/City of Gilroy.

Contact Information

Name
Serge Glushkoff
Agency Name
Fish and Game #3
Contact Types
Lead/Public Agency

Location

Cities
Gilroy
Counties
Santa Clara
Cross Streets
Thomas Road bridge to Farman Lane
Parcel #
808-21-026, 808-21-030, 808-21-028
Waterways
Uvas Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print