Bridge 23C-201 Replacement Project on Flannery Road at The Big Ditch

2 Documents in Project

Summary

SCH Number
2001022061
Lead Agency
Solano County
Document Title
Bridge 23C-201 Replacement Project on Flannery Road at The Big Ditch
Document Type
NOD - Notice of Determination
Received
Posted
11/28/2001
Present Land Use
Exclusive Agricultural
Document Description
The California Department of Fish and Game is executing a Lake or Streambed Alteration Agreement number R2-2001-489 pursuant to Section 1601 of the Fish and Game Code to the project applicant, Solano County Transportation Department. This agreement pertains to replacement of the Flannery Road Bridge (Bridge 23C-201) at The Big Ditch in Solano County. The existing two span wooden structure (37.4 ft by 22 ft) will be replaced with a larger reinforced concrete slab structure (87.9 ft by 27.5 ft). The new bridge will retain the same alignment and location as the existing bridge. To reduce erosion damage to Flannery Road, a 133 ft. long section of The Big Ditch will be realigned south of the existing bridge. The banks and slopes adjacent to The Big Ditch will be revegetated and portions will be stabilized with rock slope protection.

Contact Information

Name
Cathie Vouchilas
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Rio Vista
Counties
Solano
Cross Streets
Highway 113
Zip
94571
Total Acres
A.P.E.:1.29 HA
State Highways
113
Waterways
The Big Ditch
Township
4N
Range
2E
Section
6/7
Base
Mt. Diab

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print