Gravel Mining Reach and Special Run Pools 9/10 Restoration and Mitigation Projects

4 Documents in Project

Summary

SCH Number
2001022029
Lead Agency
Turlock Irrigation District
Document Title
Gravel Mining Reach and Special Run Pools 9/10 Restoration and Mitigation Projects
Document Type
NOD - Notice of Determination
Received
Posted
6/18/2001
Present Land Use
Vacant / Agriculture zoning.
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1601 of the Fish and Game Code to the project applicant, Turlock Irrigation District. The applicant proposes to restore a single channel and floodplain through the SRP 9 segment by filling the existing area with approximately 146,000 cubic yards of material. Fill will be imported to the site from yet-to-be-determined sources. The Operator will create salmonid spawning riffles in the newly created channel. The Operator will construct an "infiltration galley" to divert water from the Tuolumne River at this location into a nearby irrigation canal. The Operator will repair an approximately 100-foot breach of beam in the area.

Contact Information

Name
Clarence J. Mayott
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Hughson
Counties
Stanislaus
Cross Streets
Geer Road
Total Acres
1+
Waterways
Tuolumne River

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes