The Center at Needham Ranch Phase 2 Drainage Improvements Project

10 Documents in Project

Summary

SCH Number
2001021121
Lead Agency
City of Santa Clarita
Document Title
The Center at Needham Ranch Phase 2 Drainage Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2024
Document Description
The project is limited to modifications along two ephemeral drainages, the construction of an Arizona crossing, the placement of storm drain connection points, installation of several energy dissipators, and the installation of outlets from the existing biofiltration basins. The project will include removal of existing vegetation and the grading and reconstruction of both drainages. The proposed modifications will function to support the needs of a large master planned business park formerly referred to as The Gate-King Industrial Park project, which was previously permitted.

Contact Information

Name
Angela Castanon
Agency Name
California Department of Fish and Wildife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Santa Clarita
Counties
Los Angeles
Regions
Southern California
Other Location Info
The project is located along Newhall Creek, a tributary to the South Fork of the Santa Clara River. The project location is west of State Route 14 (SR-14), south of Newhall and east of Pine Street in the City of Santa Clarita within Los Angeles County; and can be located using the following information; Latitude 34.370592, Longitude -118.520903; Assessor’s Parcel Number (APN) 2827-051-083.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print