El Rio Sewer System Project, phases 5B05D (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-4680-120

7 Documents in Project

Summary

SCH Number
2001021085
Lead Agency
United States Environmental Protection Agency (EPA)
Document Title
El Rio Sewer System Project, phases 5B05D (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-4680-120
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2009
Document Description
The Project will help reduce nitrate contamination of the area groundwater by converting a residential and industrial area from a septic sewage system to a collection/central treatment sewage system. The Project will involve: 1) constructing ~1,400 linear ft of trench stabilization, ~28,500 linear ft of 8 inch diameter sewer pipeline, ~100 manholes, and necessary connections and clean-outs within the public right-of-way; and 2) conducting necessary site preparation, access, traffic control and security improvements. The completed sewer collection system will transport sewage from the collection system to City of Oxnard wastewater treatment plant for treatment and disposal.

Contact Information

Name
Lisa Lee
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Oxnard, Ventura
Counties
Ventura
Cross Streets
Central Ave., Hwy 101
Zip
93009
Total Acres
950
Parcel #
Oxnard & Saticoy Quadrangles
State Highways
U.S. 101
Railways
Union Pacific
Airports
Oxnard Airport
Schools
Rio Nusa High
Waterways
Santa Clara River
Other Location Info
City/Nearest Community: North Central El Rio

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print