El Rio Sewer System Project Phases V and VI; State Revolving Fund Load No. C-06-4680-110
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2001021085
- Lead Agency
- United States Environmental Protection Agency (EPA)
- Document Title
- El Rio Sewer System Project Phases V and VI; State Revolving Fund Load No. C-06-4680-110
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/6/2007
- Document Description
- Phases V and VI project tasks involve installing collection pipelines. The proposed project will construct and operate a network of 8-inch collection pipelines within North Central El Rio. The project will also install 15-inch and 18-inch collection pipelines through various streets, including Simon Way, Vineyard Avenue, Cortez Street, Helsam Avenue, Corsicana Drive, Balboa Street, and Stroube Street, and will eventually connect the collection pipelines to the Oxnard Wastewater Treatment Plant.
- Contact Information
-
Kari Schumaker
State Water Resources Control Board
Lead/Public Agency
Division of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814
Phone : (916) 341-7388
Location
- Cities
- Oxnard
- Counties
- Ventura
- Cross Streets
- Central Ave., Hwy 101
- Zip
- 93009
- Total Acres
- 950
- Parcel #
- Oxnard & Saticoy Quadrangles
- State Highways
- U.S. 101
- Railways
- Union Pacific
- Airports
- Oxnard Airport
- Schools
- Rio Nusa High
- Waterways
- Santa Clara River
- Other Location Info
- City/Nearest Community: North Central El Rio
Notice of Determination
- Approving Agency
- State Water Resource Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Water Resource Control Board
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.