Merced Garden Suites and Lakeview Dining Facilities;

17 Documents in Project

Summary

SCH Number
2001021065
Lead Agency
University of California
Document Title
Merced Garden Suites and Lakeview Dining Facilities;
Document Type
NOD - Notice of Determination
Received
Posted
10/14/2004
Present Land Use
Grazing lands and a public golf course. Zoning A2
Document Description
The Corporation Yard Building is designed to contain 17,060 GSF serving two general space types: offices and shops/warehouse space. The project is a one-story pre-fabricated metal clad building with a shed roof. The Corporation Yard Building will share a loading dock with the Logistical Support/Services Building to form a campus support facilities complex. The 0.86-acre site for the Corporation Yard Building is located in the northeast region of the Phase 1 campus, adjacent to the Logistical Support/Services Facility on the southeast and bounded by the Central Plant Building on the southwest, and agriculture grazing land to the north and east. To accommodate the proposed project, the 2001 LRDP has been amended to change the designation of the new Corporation Yard Building site from "Parking to Campus Support." Addendum #5 prepared for the project concludes that the minor revisions to the design and location of the Corporation Yard Building from the facilities described in the Final EIR do not trigger the need for a supplemental or subsequent EIR under CEQA.

Contact Information

Name
John Zimmermann
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
Merced
Counties
Merced
Cross Streets
Lake and Bellevue Roads
Total Acres
~2,000
State Highways
99
Airports
Merced Municipal
Township
6S
Range
14E
Section
26

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print