Pastoria Energy Facility Expansion

9 Documents in Project

Summary

SCH Number
2001019029
Lead Agency
California Energy Commission
Document Title
Pastoria Energy Facility Expansion
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2001
Document Description
The project is a 750 MW, natural gas-fired, combined cycle, electric generating power plant. It will require construction of an 11.7 foot natural gas pipeline, and a 1.4 mile, 230 kV transmission line that will interconnect with southern California Edison's transmission system. The project's water needs will be supplied primarily from Wheeler Ridge-Maricopa Water Storage District.

Contact Information

Name
Kae C. Lewis
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Counties
Kern
Other Location Info
Tejon Ranch

Notice of Determination

Approving Agency
California Energy Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print