Kern Delta Water District Water Banking and In-Lieu Water Supply Project (SWPAO #03019)

11 Documents in Project

Summary

SCH Number
2001011103
Lead Agency
Kern Delta Water District
Document Title
Kern Delta Water District Water Banking and In-Lieu Water Supply Project (SWPAO #03019)
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2005
Present Land Use
Agricultural, public right-of-way, railroad right-of-way, water recharge
Document Description
The FEIR for the project provided for the construction of 614 to 814 acres of spreading basins for groundwater recharge, 440 to 660 of these acres in the vicinity of the Buena Vista Canal south of Panama Lane. Subsequent to FEIR certification and adoption, a 70-acre parcel with characteristics suitable for use as a recharge basin has become available. This parcel consists of 27 acres of land excavated for fill construction of I-5 and an additional 43 acres of highly disturbed land currently used for disposal of materials from the demolition of roads and other facilities. The site consists of a 27-acre pit, about 20 to 30 feet deep, surrounded by flat lands with highly compacted soils. Conversion of the pit for use as a groundwater basin would initially require no construction activity except to connect the pit to existing canals. Prior to this work, the site would be surveyed by a permitted biologist and, if sensitive wildlife were found within a proposed alignment, the alignment would be modified to avoid impacts.

Contact Information

Name
L. Mark Mulkay
Agency Name
Kern Delta Water District
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Panama Lane, Taft Highway, I-5
Zip
93307
Total Acres
815-908
Parcel #
Various
State Highways
99, 119, 223
Railways
Southern Pacific
Schools
Two
Waterways
Kern River

Notice of Determination

Approving Agency
Kern Delta Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print