Kern Delta Water District Water Banking and In-Lieu Water Supply Project (SWPAO #03019)

11 Documents in Project

Summary

SCH Number
2001011103
Lead Agency
Kern Delta Water District
Document Title
Kern Delta Water District Water Banking and In-Lieu Water Supply Project (SWPAO #03019)
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2005
Present Land Use
Agricultural, public right-of-way, railroad right-of-way, water recharge
Document Description
Instead of constructing a 7-mile pipeline-canal, Kern Delta proposes to utilize certain additional capacity in the Cross Valley Canal for west-to-east conveyance of supplies from the California Aqueduct and, in connection therewith, to construct a 2150-foot long Cross River Pipeline from the CVC to the Buena Vista Canal along an alignment parallel to the Calloway Drive/Old River Road bridge crossing. The proposed pipeline would cross a section of the Kern River 275 feet in width, about 900 feet of which is adjacent to the Kern River floodplain within the flood control levees of the Kern River. The Cross River Pipeline project will incorporate the same USFWS and CDFG approved measures to avoid and minimize potential effects on animal movement along the riverbed and floodplain that were incorporated in the FEIR project. As provided in the FEIR, best management practices approved by CDFG will also be incorporated into the project to avoid and minimize effects related to fuel, oil, and other material spills from construction equipment.

Contact Information

Name
L. Mark Mulkay
Agency Name
Kern Delta Water District
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Panama Lane, Taft Highway, I-5
Zip
93307
Total Acres
815-908
Parcel #
Various
State Highways
99, 119, 223
Railways
Southern Pacific
Schools
Two
Waterways
Kern River

Notice of Determination

Approving Agency
Kern Delta Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print