Rancho Bernardo Pipeline No. 2 and Black Mountain Ranch Reclaimed Water Pipeline; Black Mountain Road Pipelines (Formerly Rancho Bernardo Pipeline No. 2 and Bla

3 Documents in Project

Summary

SCH Number
2001011086
Lead Agency
City of San Diego
Document Title
Rancho Bernardo Pipeline No. 2 and Black Mountain Ranch Reclaimed Water Pipeline; Black Mountain Road Pipelines (Formerly Rancho Bernardo Pipeline No. 2 and Bla
Document Type
NOD - Notice of Determination
Received
Posted
1/22/2003
Document Description
Alter the stream to remediate the diversion of the stream through a sinkhole into a tunnel being dug beneath the stream as part of the Black Mountain Road Pipelines Project. The remediation project involves diverting the stream by blocking the flow just upstream of culverts associated with an existing crossing, pumping the pooled water to a desilting area downstream of the sinkhole and returning it to Los Penasquitos Creek, then pumping the water in the sinkhole will be clocked to prevent water from back-flowing into the site. Once the water is diverted, a pumper truck will be set up on Black Mountain Road and will pump a slurry mix into the sinkhole to stabilize the tunnel. Any water containing slurry will be pumped back into the tunnel or into an existing desilting tank to settle. Native riparian habitats found on site include: southern willow scrub, freshwater marsh, and open water.

Contact Information

Name
Nicole McGinnis
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Scripps Ranch Boulevard, Westmore Road, Westview Parkway, Black Mountain Road, and Trails Road
State Highways
15
Waterways
Lake Miramar
Township
14S
Range
2W
Section
30-32
Other Location Info
Communities: Scripps Ranch, Mira Mesa, and Rancho Bernardo

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print