The Accelerated School Expansion Project
2 Documents in Project
Summary
SCH Number
2001011051
Lead Agency
Los Angeles Unified School District
Document Title
The Accelerated School Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2001
Present Land Use
Limited Industrial and Commercial Manufacturing
CM-1, R2-1, and [Q]C2-1VL
Document Description
The Accelerated School is a charter school that currently serves approximately 240 students in a combination of remnant structures from past garment manufacturing uses and more recent construction specific to school uses. Almost one-half of the existing site consists of warehouse-type structures unsuitable for conversion to school uses because they do not meet District earthquake standards. The Accelerated School will expand its facilities and enrollment by demolishing the warehouse-type buildings that currently exist on site, as well as the three residential properties on Woodlawn Avenue recently acquired by the school, and constructing a new 96,000-square foot facility to serve approximately 870 pre-school through grade 12 students.
Contact Information
Name
Cecilia Masson
Agency Name
Los Angeles Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Martin Luther King, Jr. Boulevard and Main Street
Zip
90011
Total Acres
4
State Highways
IH-110
Railways
UPRR
Schools
proposed project
Waterways
Los Angeles River
Notice of Determination
Approving Agency
Los Angeles Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.