Culver Drive Widening and Realignment IS/EA

2 Documents in Project

Summary

SCH Number
2001011030
Lead Agency
City of Taft
Document Title
Culver Drive Widening and Realignment IS/EA
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2003
Present Land Use
Culver Drive between Campus Drive and Bonita Canyon Drive is classified as a Primary Highway (four lane divided roadway).
Document Description
The project proposed will widen Culver Drive from a two lane undivided roadway to a four lane divided roadway. The project will result in a 64-foot wide roadway located west of, and partially overlapping, the current roadway. The revised project description, dated August 15, 2002 called for the new road alignment to provide a 60-foot setback from the existing "Village of Turtle Rock" development on the east side of the road, resulting in decreased impacts to the wetlands located west of the road. In addition, the proposed project development will require the extension of a 48-inch reinforced concrete pipe culvert for the road crossing and the implementation of stormwater management measures located at Drainage A.

Contact Information

Name
Sun-Sun Murillo
Agency Name
City of Irvine, Department of Public Works
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
Culver Drive between Campus Drive and Bonita Canyon Drive
Zip
92623-9575
Total Acres
7
State Highways
I-405
Schools
University of California, Irvine
Waterways
San Diego Creek
Township
6S
Range
9W
Section
89, 99
Base
Tustin
Other Information
Section: 100

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print