Chiriaco Summit Water District Water System Improvements Projects
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2001011027
- Lead Agency
- Chiriaco Summit County Water District
- Document Title
- Chiriaco Summit Water District Water System Improvements Projects
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/19/2017
- Document Description
- SWRCB is a responsible agency for this project. The SWRCB Safe Drinking Water State Revolving Fund Program is providing funds for the project. The project located at the existing 5 acre reservoir site and includes construction of a 500,000 gallon treated water storage reservoir, installation of security fencing around the perimeter of the project site (5-acre site), a new metal building to house water supply facilities, installation of new raw water and treated water pumping units, new electrical, equipment, piping, new roughing sand filters, new surge tanks, new hydropneumatic tank, new air compressor, and new plant piping, demolition, removal, and disposal of the existing 35,000 gallon bolted steel tank, and a reservoir overflow sump, sump pump and piping.
- Contact Information
-
Victoria Morrell
SWRCB
1001 I Street, 17th Floor, Sacramento, CA 95814
Riverside, CA 92501
Phone : (951) 684-6900
Location
- Counties
- Riverside
- Cross Streets
- I-10: Chiriaco Summit Exit
- Zip
- 92201
- Total Acres
- 2+/-
- Parcel #
- 709-200-002, 003; 709-210-001, 004, 011, 012, 017
- State Highways
- I-10
- Airports
- Chiriaco Summit
- Township
- 6S
- Range
- 12E
- Section
- 10
- Base
- SBM
- Other Location Info
- Chiriaco Summit
Notice of Determination
- Approving Agency
- SWRCB
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 1001 I Street, 17th Floor, Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.