Temporary Urgency Change By The U.S. Bureau Of Reclamation To Add The State Water Projects

2 Documents in Project

Summary

SCH Number
2000122006
Lead Agency
State Water Resources Control Board
Document Title
Temporary Urgency Change By The U.S. Bureau Of Reclamation To Add The State Water Projects
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2000
Document Description
Reclamation proposes to add the State Water Project's (SWP) Harvey O. Banks Pumping Plant as an additional point of diversion and rediversion under Reclamation's above-listed water right permits. Approval of the petition would allow Central Valley Project (CVP) water appropriated under the above-listed water right permits to be directly diverted and/or rediverted from storage at the SWP Banks Pumping Plant and delivered through the SWP facilities to O'Neill Forebay and then to storage in San Luis Reservoir. Reclamation is requesting the change to facilitate the diversion and storage of CVP water in the federal portion of San Luis Reservoir so that the river can be filled to capacity when water becomes available sometime between now and April 15,2000. The CVP's inability to fill the federal portion of San Luis Reservoir without using the Banks Pumping Plant is a result of environmental protection actions taken in 1999. The estimated shortfall would have resulted in lower allocation of CVP water for CVP purposes or in decreased storage of CVP water in San Luis Reservoir at the end of the water year 2000. Absent the approval of the request, the SWP would use the excess capacity at Banks to move water into the federal share of San Luis Reservoir for use by the SWP. The amount of water requested under this change is not to exceed 244 thousand acre-feet (TAF) of CVP water appropriated under the above-listed water right permits assuming the 50 percent exceedance hydrology and the availability of excess flows. Under the 90-percent exceedance hydrology, project operations are limited by available water supply rather than Tracy pumping capacity. Hence, under dry conditions, Reclamation's diversions under this petition would be reduced.

Contact Information

Name
Michael Falkenstein
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print