Supplemental Santa Fe Christian Schools Master Plan Update

5 Documents in Project

Summary

SCH Number
2000111027
Lead Agency
Solana Beach, City of (City of Solana Beach)
Document Title
Supplemental Santa Fe Christian Schools Master Plan Update
Document Type
NOP - Notice of Preperation
Received

Document Description
The proposed project would improve and modernize the operations of the private school campus. The proposed project would revise the existing configuration of buildings, reduce required grading, and improve outdoor usable space and parking. The school capacity would not be increased over the currently allowed 1,110 students and is expected to be maintained around 1,000 students similar to the existing conditions. The following is a summary of the major changes to the proposed project description compared to the project as addressed in the 2001 FEIR: - Buildout of the Master Plan Update would include 169,543 sf of total structural development. This represents a decrease of 10,165 sf from the 2001 Master Plan; - Project phasing would be revised to five phases with final development to 2025 meet capital fundraising strategies; - Project would include a total of 260 parking spaces; - Internal pedestrian pathways would be improved to include Americans with Disabilities Act (ADA) accessibility improvements; - Landscape design would be improved to remove existing invasive plant species and use low water use plants; and recycled water irrigation; and - Project grading would be reduced from 40,000 cubic yards of cut, 17,000 cubic yards of fill, with an estimated 23,000 cubic yards of export in the 2001 FEIR to a proposed 5,500 cubic yards of cut, 11,000 cubic yards of fill, and an estimated 5,500 cubic yards of export.

Contact Information
Bill Chopyk
City of Solana Beach
635 South Highway 101
Solano Beach, CA 92075-2215

Phone : (858) 720-2444
bchopyk@cosb.org

Location

Cities
Solana Beach
Counties
San Diego
Cross Streets
Academy Drive
Zip
92075
Total Acres
~17
State Highways
I-5
Waterways
Pacific Ocean

Notice of Completion

Review Period Start
Review Period End
Development Type
Educational
Local Action
Master Plan Use Permit Use Permit: Modification
Project Issues
Aesthetic/Visual Air Quality Biological Resources Geologic/Seismic Noise Public Services Traffic/Circulation Water Quality Land Use Other Other Issues: Paleonology, GHGE
Reviewing Agencies
Air Resources Board California Coastal Commission California Department of Parks and Recreation California Highway Patrol Caltrans, District 11 Department of Conservation Department of Fish and Wildlife, Region 5 Department of Toxic Substances Control Department of Water Resources Regional Water Quality Control Board, Region 9 Resources Agency Native American Heritage Commission
Download CSV New Search