Lake Berryessa Resort Improvement District Erosion Control and Slope Stabilization
Summary
SCH Number
2000108226
Public Agency
Hueneme School District
Document Title
Lake Berryessa Resort Improvement District Erosion Control and Slope Stabilization
Document Type
NOE - Notice of Exemption
Received
Posted
10/24/2000
Document Description
Repair of approximately 360 feet of sewer pond access road for the Lake Berryessa Resort Improvement District. The repair consists of placing Rock Slope Protection (RSP) from the bottom of the side area. All exposed dirt (above and below) will be covered with matting and hydro-seeding to prevent erosion. Issuance of a Streambed Alteration Permit (#R3-2000-0949) pursuant to FGC Section 1601.
Contact Information
Name
Serge Glushkoff
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Napa
Other Location Info
Lake Berryessa
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
Class 1, Section 15304
Reasons for Exemption
Minor alteration to land and vegetation.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.