Linear Assets Modernization Project

11 Documents in Project

Summary

SCH Number
2000102046
Lead Agency
University of California, Berkeley
Document Title
Linear Assets Modernization Project
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2022
Document Description
UC LBNL plans to upgrade and modernize its campus-wide utility systems. This will replace outdated mechanical systems and provide more efficient and redundant utility infrastructure to meet current and projected future UC LBNL needs. Approximately 10,000 linear feet of subsurface trenches, duct banks, and utility corridors will be addressed. Existing utility trenches will be uncovered and exposed, utility lines will be swapped out, and the trenches will be recovered and resurfaced. Utility lines and appurtenances to be replaced will either be abandoned in place or removed and recycled or disposed of off-site.

Contact Information

Name
Leana Sossikian
Agency Name
UC LBNL
Job Title
Site and Environmental Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Counties
Alameda
Zip
94720

Notice of Determination

Approving Agency
UC LBNL
Approving Agency Role
Lead Agency
Approved On
County Clerk
Alameda
Final Environmental Document Available at
This is to certify that the final EIR with comments and responses and record of project approval is available to the general public at Lawrence Berkeley National Laboratory, One Cyclotron Road, Berkeley, California 94720, Attn. Jeff Philliber, Telephone: (510) 499-4012.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print