Lower Silver Creek Watershed Project
4 Documents in Project
Summary
SCH Number
2000102034
Lead Agency
Santa Clara Valley Water District
Document Title
Lower Silver Creek Watershed Project
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2001
Present Land Use
Project reaches are located in urbanized part of east of San Jose. Land uses are primarily residential and commercial.
Document Description
1. Construction of 1400 feet of channel with protected side slopes (gabion basket or vegetated block walls) with earth bottom in Reach 1c.
2. Removal of 1100 feet of existing concrete lining between Alum Rock Avenue and Lausett Avenue in Reach 3c.
3. Widening of the channel to construct 1400 feet of earth bottom channel with protected side slopes (gabion baskets or vegetated block walls) and/or 2:1 earth slopes. Three options are addressed in the Addendum: an 80-foot wide channel, a combination of an 80- and 100 foot-wide channel, and a 100-foot wide channel. The District approved the 100-foot wide channel alternative.
Contact Information
Name
Rene Langis
Agency Name
Santa Clara Valley Water District, Coyote Watershed Program
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Jose
Counties
Santa Clara
Cross Streets
From confluence w/Coyote Creek to Cunningham Avenue
Total Acres
30
State Highways
I-680/280:U.S. 101
Railways
Union Pacific
Airports
Reid-Hillview Co Airport
Waterways
Lower Silver Creek; Coyote Creek
Notice of Determination
Approving Agency
Santa Clara Valley Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.