California Polytechnic State University San Luis Obispo, Engineering/Architechture and Replacement Phase IIB, Schematic Plan Approval

4 Documents in Project

Summary

SCH Number
2000101072
Lead Agency
California State Polytechnic University, San Luis Obispo
Document Title
California Polytechnic State University San Luis Obispo, Engineering/Architechture and Replacement Phase IIB, Schematic Plan Approval
Document Type
NOD - Notice of Determination
Received
Posted
9/16/2004
Present Land Use
Public Facilities.
Document Description
This project is the final phase of collaboration between the College of Engineering and the College of Architecture and Environmental Design. This phase of the project will construct new laboratory space and faculty office space for the College of Architecture and Environmental Design, and space for interdisciplinary lecture. Along with the renovation, this project will allow both colleges to accomodate the projected growth as outlined in the master plan. The project, now referred to by the campus as EDES (Environmental Design) South, consists of four structures, one one-story building, and three three-story buildings, connected by exterior walkways. The buildings will have a drilled pier slab on grade foundations, with a stell brace frame structure. The exterior of the buildings will include glass curtain walls, ribbed metal and pre-cast panels. This project contains many sustainable features including operable windows and single loaded corridors that will allow for cross ventilation of the laboratory and lecture spaces. The building also includes appropriate shading devices and the landscaping includes the use of drought tolerant plantings. Nonstate funds will provide for three demonstration labs, a conference room and support space.

Contact Information

Name
Robert Kitamura
Agency Name
California State University Trustees
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
State Highway 1
Parcel #
073-341-003
State Highways
1 & 101
Railways
Union Pacific
Schools
Pacheco Elementary
Waterways
Stenner Creek
Township
30
Range
12
Section
23
Base
MDBM

Notice of Determination

Approving Agency
California State University Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print