Pala Road Interim Widening and Sound Wall
2 Documents in Project
Summary
SCH Number
2000101066
Lead Agency
City of Temecula
Document Title
Pala Road Interim Widening and Sound Wall
Document Type
NEG - Negative Declaration
Received
Present Land Use
Partially developed public street and shoulder and existing landscaping
Urban Arterial (6-lane divided) and Arterial (4-lane divided)
Document Description
Widen the current paved surface of Pala Road between Murfield Drive and the entrance to the Pechanga Casino from two to four lanes. The project includes both the replacement of pavement and the installation of new asphalt along the northeast side of the existing roadway and the construction of a sound mitigation wall along the west side of Pala Road from the end of the current sound wall to Via Eduardo. Specifically, the project would add between 10 and 20 feet of new pavement along the northeast side of Pala Road for a distance of about one mile. The project includes the installation of traffic signals at the intersections of Pala and Loma Linda Roads and Pala Road and Wolf Valley Road/Via Eduardo.
Contact Information
Name
David Hogan
Agency Name
City of Temecula
Contact Types
Lead/Public Agency
Phone
Location
Cities
Temecula
Counties
Riverside
Cross Streets
Pala Road/ SR-79/ Murfield Drive
State Highways
I-15/ SR-79
Schools
Temecula Creek and Pechanga Creek
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Justice, Attorney General's Office, California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of Fish and Wildlife, Region 6, Department of Water Resources, Resources Agency
Development Types
Other (Interim Roadway, Signal Improvements, and Sound Mitigation Wall)
Local Actions
Capital Improvement Project
Project Issues
Aesthetics, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife, Light & Glare
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.