Wasco State Prison Wastewater Prescreening Facility Project

1 Documents in Project

Summary

SCH Number
2000098313
Public Agency
California Department of Corrections and Rehabilitation (CDCR)
Document Title
Wasco State Prison Wastewater Prescreening Facility Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/27/2000
Document Description
The proposed project at the Wasco State Prison (WSP) would construct a prescreening facility to remove large-sized debris from the wastewater collection system at the WSP Wastewater Treatment Plant (WWTP). The prescreening facility would be approximately 1200 square feet in size, with two channels from the ground to the collection system's main line, isolation gates to allow independent channel flow, and automatic bar screens in both channels to carry debris to the top structure. The project is needed because the WSP WWTP has an on-going problem with copious amounts of large-sized debris flushed into the wastewater collection system by inmates. The WSP has to manually remove the debris on a daily basis in order to prevent clogging of the wastewater treatment system. The project would provide an efficient method of debris removal to accommodate the existing prison population.

Contact Information

Name
Maria C. Sosa
Agency Name
Department of Corrections
Contact Types
Lead/Public Agency

Location

Cities
Wasco
Counties
Kern

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 3 Section 15303
Reasons for Exemption
The project would construct a small structure in an existing State facility with no expansion of existing use.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.