Reclamation Plan 00-01 (Yuba River Properties)
3 Documents in Project
Summary
SCH Number
2000092068
Lead Agency
Yuba County
Document Title
Reclamation Plan 00-01 (Yuba River Properties)
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2001
Present Land Use
Current land use is surface mining. The General Plan land use designation is Extractive Industrial and the zoning designation is Extractive Industrial (M2).
Document Description
The Reclamation Plan (RP 00-01) has been filed under the requirement of Yuba County Ordinance Code Chapter 11.20 - Surface Mining and the State Surface Mining and Reclamation Act (SMARA). In summary, the document describes how mined lands will be restored after mining is completed. There are two operations, Garcia Sand and Gravel (91-58-0023) and Stringer Pit (91-58-0022), that are described in RP 00-01. Both mining operations are considered permitted via a vested right to mine. That is an operation that was in existence prior to 1976 pursuant to SMARA. The site is located entirely within the County General Plan land use designation of Extractive Industrial wih a zoning designation of Extractive Industrial (M-2).
Contact Information
Name
Peter Calarco
Agency Name
Yuba County Community Development Department
Contact Types
Lead/Public Agency
Phone
Location
Counties
Yuba
Total Acres
120
Parcel #
005-270-018, 005-270-143, 006-170-068, 006-170-070, 006-170-125
State Highways
20
Schools
Browns Valley Elementary
Waterways
Yuba River
Township
16N
Range
5E
Section
23-26
Base
MDB&M
Other Location Info
Browns Valley (unincorporated)
Notice of Determination
Approving Agency
Yuba County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No